A casing jack pulls pipe the rig can’t, or pulls it where no rig is worth bringing in. It sits on the wellhead, grips the casing in slips, and lifts it with hydraulic cylinders one stroke at a time. The jack carries the load into the wellhead, not into a derrick, so the job lives or dies on three numbers: what the pipe can stand, what the jack can pull, and what the wellhead can carry.
1. Know the pipe
Get the casing record for the string you are pulling: outside diameter, nominal weight, grade and connection. From those, our casing table gives the wall, inside diameter, drift, body yield and joint strength. If the record is lost, measure the OD at the surface and treat the grade as the weakest one that size was run in.
The working limit on the string is the lesser of body yield and joint strength, divided by a design factor. We use 1.25 by default (80% of the lesser rating). Old, corroded or worn pipe deserves a bigger factor. The max pull calculator does this for any row in the table.
2. Find out how much pipe is free
You only lift what is free. If the casing is cemented or stuck, find the free point first (see the free point page), then cut above it. The pipe you pull is the pipe above the cut.
3. Work out the pull you need
Pull needed is the buoyed weight of the free pipe plus whatever extra it takes to break it loose: mud, scale, a tight spot, a parted collar dragging. Buoyed weight is the air weight times the buoyancy factor for the fluid in the hole. The buoyancy calculator gives both.
Then compare:
- The pull needed must be under the string’s working limit, or the pipe will part before it comes free.
- It must be under the jack’s design pull and under the jack’s relief setting for that string.
- The wellhead, a cellar bridge or bearing mats must carry the full reaction load without settling.
If any of the three fails, change the plan before anyone rigs up: cut shallower, wash over, circulate, or bring a bigger jack.
4. Rig up
Follow the jack rig-up page. Slips and inserts must match the casing OD. Check the bowls are clean, the inserts are sharp, and the power unit is set to the relief figure for this string.
5. Pull
- Set the slips, take a strain, and watch the gauge. Bring the load up in steps rather than all at once.
- Note the pull at which the pipe starts to move. It tells you how much drag there is and whether the cut is where you think it is.
- Stroke up, set the holding slips, release the traveling slips, retract, and repeat.
- When a coupling reaches the floor, break it out and lay the joint down. Keep a tally: joint number, length and condition.
Stop and rethink if the pull climbs toward the working limit without movement. More pull on stuck pipe usually ends with parted pipe and a longer fishing job.
6. After the pull
Measure what came out against what the record says was in the hole. A short tally means pipe left behind: plan the next cut or the fishing run before anyone rigs down.
Every figure here comes from your own pipe records and the calculators on this site. Check them against the well file before you pull.